Plumbline

Exception ledger

2 open findings

Sorted by severity, then by the contract value standing behind the finding. A rule either fires or it does not; there is no score and nothing is ranked by a model.

HighCOI-UMB-LIMIT-LOWVista Plumbing CoFire Protection · Doral Tech Annex · $8,200,000

Umbrella limit is $2,500,000 against a required $5,000,000

Why it matters Excess limits are what respond to a serious injury or a structural loss. A short umbrella is the single most common way a subcontract's insurance exhibit is quietly not met.

observed $2,500,000required $5,000,000source coi_umbrella_38_295.pdf p.3SC-DTA-2508-038
HighCOI-AI-MISSINGIronwood InteriorsRoofing · Doral Tech Annex · $5,600,000

Additional insured endorsement is required by the subcontract and is not shown on the certificate

Why it matters Without additional insured status the owner has no direct right to the subcontractor's policy and must tender through indemnity, which is slower and contestable.

observed not shownrequired requiredsource coi_gl_39_299.pdf p.1SC-DTA-2508-039